KEI has been based in Japan

Robot Maintenance Service

Robot Maintenance


|Flow Until Work Completion

1、 Schedule Meeting With Maker, Preliminary Inspection
2、Arrangement Of Replacement Parts
3、Part Exchange, Adjustment In A Maker
4、Trial Run In The Maker

The Periodical Maintenance In The Period That The Robot Maker Set After Robot Introduction Is Necessary.
Causes The Trouble When Neglect This And Becomes The Worst Line Stop.

powered by Quick Homepage Maker 5.3
based on PukiWiki 1.4.7 License is GPL. QHM

最新の更新 RSS  Valid XHTML 1.0 Transitional